DIMES Progress Report


RR0901 - 1 February 2009


We have decided to squeeze the injection in while we have some good weather. The weather promises to deteriorate starting Wednewday morning, so we have about 36 hours between the time we arrive on site tomorrow around dinner time and Wednesday around breakfast. The injection must go flawlessly for us to get all the tracer injected in this time. We will increase the flow rate and turn the sled around quickly between the two casts that it will take if nothing breaks. So the schedule is something like the attached. Please note that the positions will be revised slightly as satellite data come in---tomorrow by noon.

We will do the remainder of the CTD line and floats after the injection. We will deploy the last 2 shearmeters and sets of RAFOS floats during sampling of the tracer patch, after the CTDs are done.

Injection Schedule:  2-4 February 2009


Date
Local Times
Latitude
Longitude

Mon 2/1
2000
58 09
106 30
Deploy injection sled
Tue
2/2
1100
58 09
106 58
Retrieve sled, turn it around
Tue 2/2 1200 58 09
106 44
Deploy SOLO float, EM-APEX

Shearmeter, 3 RAFOS

back near center of streak

Tue 2/2 1400 58 15 106 30 Deploy injection sled
Wed 2/3 0400 58 15 106 58 Recover sled
Wed 2/3 0600 58 15 106 44 Deploy SOLO float

Shearmeter, 3 RAFOS

back near center of streak